Skip to Content
Enter
Skip to Menu
Enter
Skip to Footer
Enter
Blog
Blog Details

Floods, Heat and Water: Climate Risk Assessment as a Planning Tool for PSX and GCC Companies

November 18, 2026
9 Min

Pakistan’s 2022 floods caused USD 14.9 billion in damage and a further USD 15.2 billion in economic losses, according to the World Bank’s Post-Disaster Needs Assessment (PDNA). For companies listed on the Pakistan Stock Exchange (PSX), that was not a distant climate story. It was flooded sites, cut supply routes and a cotton crop that never reached the mills.

A climate physical risk assessment turns floods, heat and water shortages into planned costs. For Pakistan and GCC companies, it shows the CFO which sites, assets and suppliers are exposed, what a bad year could cost, and how much of that cost insurance will not carry.

Spectreco, a US-headquartered sustainability technology and advisory company with offices in Atlanta, Lahore, Dubai, Muscat and Riyadh, works with listed companies, banks and exporters on exactly this question. This article is part of our ESG readiness series. It covers the local evidence, how an assessment works, the insurance gap, what IFRS S2 asks for, and a five-step plan.

Source: World Bank, Pakistan PDNA, 28 Oct 2022

On this page

  • What is a climate physical risk assessment?
  • The local evidence: floods, heat and water
  • How a physical risk assessment works
  • Will insurance cover climate losses?
  • What does IFRS S2 require on physical risk?
  • How to build a climate risk assessment in five steps
  • Frequently asked questions

What Is a Climate Physical Risk Assessment?

Direct answer: A climate physical risk assessment maps a company’s sites, assets and key suppliers against climate hazards. The main ones are floods, extreme heat and water shortage. It then estimates what those hazards could cost in damage, downtime and lost sales. The numbers feed budgets, capex plans and insurance decisions.

IFRS S2, the International Sustainability Standards Board’s (ISSB) climate disclosure standard, splits physical risk into two types:

  • Acute risk: event-driven damage from storms, floods, droughts and heatwaves.
  • Chronic risk: longer-term shifts in climate patterns, such as hotter summers or falling water availability.

Source: CGMA Insights, ISSB Standards guide

The point is planning, not paperwork. A finance team that knows a plant can lose two weeks of output in a bad monsoon can budget for it. A team that does not finds out from the flood.

The Local Evidence: Floods, Heat and Water in Pakistan and the GCC

Floods: the 2022 bill

  • The worst-hit sectors were housing (USD 5.6 billion), agriculture and livestock (USD 3.7 billion), and transport and communications (USD 3.3 billion).
  • Sindh carried close to 70% of total damages and losses.
  • Cotton arrivals fell about 41% year on year: 3.708 million bales by 1 November 2022, against 6.257 million a year earlier, per Pakistan Cotton Ginners’ Association data.

Sources: World Bank, Pakistan PDNA, 28 Oct 2022, Business Recorder, PCGA data to 1 Nov 2022

For a spinning mill, that is a raw-material shock. For a bank, it is a borrower problem across a whole province.

Heat: lost hours and lost export earnings

  • Extreme heat and flooding could cut apparel export earnings in Pakistan, Bangladesh, Cambodia and Vietnam by about USD 65 billion (22%) over 2025 to 2030, according to Cornell University’s Global Labor Institute and Schroders. The figure covers the four countries together; there is no Pakistan-only number.
  • The International Labour Organization (ILO) projects that heat stress will cost 2.2% of global working hours by 2030, equal to 80 million full-time jobs. In South Asia the figure is about 5%.

Sources: Cornell GLI and Schroders, via Dawn, 13 Sep 2023, ILO, via IISD SDG Knowledge Hub, Jul 2019

Water: a chronic risk that has already arrived

Pakistan’s water availability fell to 899 cubic metres per person in 2025, below the 1,000 cubic metre scarcity line, according to a Ministry of Water Resources report to the National Assembly. The World Resources Institute (WRI) Aqueduct data places all six GCC states among the countries facing extremely high water stress. For textile processing, cement, food and building cooling, water is an input with a supply risk. Our post on mill energy and water savings shows what metering finds.

Sources: Ministry of Water Resources data, via Dunya News, 4 Mar 2026, WRI Aqueduct, via Down To Earth, Aug 2023

Supply chains bring the risk in

The McKinsey Global Institute found that industries face a month-long supply disruption every 3.7 years on average. A plant on high ground can still stop when its supplier floods or its port road washes out.

Source: McKinsey Global Institute, via Adnkronos, Aug 2020

How a Physical Risk Assessment Works

Hazards: what could happen, where

Each location is screened for river and flash flooding, extreme heat, water stress and drought. Acute events and chronic trends are scored separately, over short, medium and long horizons.

Assets and operations: what it would hit

The hazard map is laid over plants, warehouses, stock, machinery, staff and power supply. The output is a list of exposed sites and the business activity each one carries.

Supply chain: who you depend on

Critical suppliers, raw-material regions and logistics routes go through the same screen: cotton districts for a textile group, water and cooling capacity for a GCC developer.

From exposure to money

Exposure only becomes useful when it carries a number: downtime days, repair capex, lost revenue, higher input costs and extra insurance. The IFRS Foundation accepts a proportionate approach. A company with limited exposure or resources can start with qualitative scenario analysis and deepen it over time.

Source: IFRS Foundation proportionality factsheet, Jan 2025

Will Insurance Cover Climate Losses?

Direct answer: Mostly not. In 2025, insurers covered USD 108 billion of USD 224 billion in global natural disaster losses. In Asia-Pacific, only USD 9 billion of USD 73 billion was insured, according to Munich Re. Most of a bad flood year stays on the company’s own balance sheet.

Companies feel it. In Marsh’s September 2026 survey of more than 120 organisations, 43% had suffered extreme-weather losses or disruption in the past three years. 62% expect insurance cost or availability to get worse over the next five years.

Sources: Munich Re, natural disaster figures 2025, 13 Jan 2026, Marsh, climate adaptation survey, 22 Sep 2026

Why disclosure alone does not lower premiums

Only 26% of firms in the same Marsh survey had their adaptation measures recognised in insurance negotiations. We have found no published evidence that a sustainability disclosure, on its own, lowers a premium. Insurers price the hazard at a location and the loss history behind it.

Source: Marsh, climate adaptation survey, 22 Sep 2026

What a broker can use at renewal is site evidence: flood defences, raised equipment, backup water and power, and loss records. The assessment produces that evidence; the report only describes it. Our skeptical CFO post covers other ESG claims that fail scrutiny.

What Does IFRS S2 Require on Physical Risk?

Direct answer: IFRS S2 asks for climate risks that could reasonably affect cash flows, access to finance or cost of capital. Physical risk is one category. Companies must use scenario analysis to test their climate resilience. They must also report the amount and percentage of assets or business activities vulnerable to physical risk.

The physical-risk links in practice:

  • Risk identification: name the acute and chronic risks over the short, medium and long term, and how they affect the business model and value chain.
  • Climate resilience: run scenario analysis, using all reasonable and supportable information available without undue cost or effort.
  • Paragraph 29(c) metric: disclose the amount and percentage of assets or business activities vulnerable to climate-related physical risks. The ISSB’s Transition Implementation Group noted that scenario analysis and asset impairment testing inputs can inform this figure.

Sources: IFRS Foundation, IFRS S2 overview, CGMA Insights, ISSB Standards guide, IFRS Foundation, Transition Implementation Group summary, Mar 2024

The timeline for PSX and GCC companies

The Securities and Exchange Commission of Pakistan (SECP) phases in IFRS S1 and S2 by size:

  • Phase I: periods beginning on or after 1 July 2025, for listed companies meeting any two of: turnover above Rs 25 billion, more than 1,000 employees, assets above Rs 12.5 billion.
  • Phase II: from 1 July 2026, at half those thresholds (Rs 12.5 billion, 500 employees, Rs 6.25 billion).
  • Phase III: from 1 July 2027, for all other listed companies and licensed public interest companies.
  • Assurance: required from the second year of reporting.

Sources: IFRS Foundation, Pakistan jurisdictional profile, SECP press release, 1 Jan 2025

The IFRS Foundation counts 40 jurisdictions using or introducing ISSB Standards, covering about 60% of global GDP, Qatar among them. One assessment serves the SECP filing, a bank’s credit review and a GCC regulator. For the transition-risk side of IFRS S2, see our carbon levy post.

Source: IFRS Foundation, ISSB update, 20 Mar 2026

How to Build a Climate Risk Assessment in Five Steps

  1. List what you own and who you depend on. Geolocate every site, major asset and warehouse, plus critical suppliers and logistics routes. Finance and operations should own this list together.
  2. Screen each location for floods, heat and water. Score acute and chronic hazards for each site and supplier region. Use public hazard data first; buy detail only where exposure is high.
  3. Put a number on a bad year. Estimate downtime days, repair capex, lost sales and input-cost spikes for the exposed sites. Start with qualitative scenarios where data is thin.
  4. Test the insurance gap. Compare the estimated loss with what the policy pays after limits and deductibles. The gap is what the company must fund or reduce through adaptation.
  5. Put the results into plans and disclosure. Feed them into the budget, capex plan and board risk register. Use the same figures for the IFRS S2 paragraph 29(c) metric, and refresh them every year.

Banks ask the same questions of borrowers. A company that has done these steps answers a lender’s climate questionnaire from its own files, which helps when applying for GCC sustainable finance.

Frequently Asked Questions

It is a structured review of how climate hazards such as floods, extreme heat and water shortage could affect a company’s sites, assets and suppliers. It identifies which locations are exposed, estimates the cost of damage, downtime and lost sales, and compares that cost with insurance cover. The results feed budgets, capex decisions and IFRS S2 disclosure, so the assessment works as a planning tool rather than a report.
The World Bank’s PDNA put damage at USD 14.9 billion and economic losses at USD 15.2 billion, with Sindh carrying close to 70%. Agriculture and livestock was among the worst-hit sectors at USD 3.7 billion. Cotton arrivals fell about 41% year on year by November 2022, hitting textile input supply. Companies faced damaged sites, broken transport links and weaker borrowers and customers in affected regions.
Only partly. Munich Re reports that in 2025 just USD 9 billion of USD 73 billion in Asia-Pacific disaster losses was insured, against USD 108 billion of USD 224 billion globally. In Marsh’s 2026 survey, 62% of firms expected insurance cost or availability to worsen. Companies in Pakistan and the GCC should assume that most of a severe loss will sit on their own balance sheet.
Not on its own. In Marsh’s September 2026 survey, only 26% of firms had their adaptation measures recognised in insurance negotiations, and there is no published evidence that disclosure by itself lowers premiums. Insurers price the hazard at each location and the loss history. Site-level evidence, such as flood defences, backup water and power, and loss records, gives a broker more to work with at renewal.
IFRS S2 requires companies to identify acute and chronic physical risks that could affect cash flows, finance access or cost of capital. They must use scenario analysis to assess climate resilience, scaled to their circumstances. Paragraph 29(c) asks for the amount and percentage of assets or business activities vulnerable to physical risk. In Pakistan, SECP applies these rules in three phases from July 2025.

‍

Plan for the Bad Year Before It Arrives

Spectreco’s climate risk assessment maps your sites, assets and critical suppliers against flood, heat and water hazards. It puts a cost on the exposure and feeds the results into your budget, your insurance renewal and your IFRS S2 disclosure. Our advisory team works alongside your finance, risk and operations teams, so the knowledge stays in the company.

The Virtual Sustainability Office combines that advisory team with our ESG platform, so the assessment is refreshed each year rather than rebuilt.

Next step: book a Spectreco climate risk assessment through our Decarbonization and Net-Zero Strategy advisory, which covers physical and transition risk, and see which of your sites and suppliers carry the most exposure before the next monsoon or summer peak. For the IFRS S2 filing itself, our Compliance, Reporting and Disclosures advisory turns the results into the disclosure.

‍

Ready to Simplify
Your ESG Journey?
Spectreco combines an AI‑driven platform, Virtual Sustainability Office, and advisory services to turn your sustainability goals into measurable performance and value.